1 |
HAZOP and HAZID facilitator for TGI tie-in ORF section-2 at Pemping Island |
PLN BATAM – UBE |
Completed |
2 |
HAZOP Facilitator for “Pemanfaatan Gas Lapangan Bukit Tua Petronas Carigali Ketapang Ltd: Pemasangan Pipa Distribusi Gas Diameter 16” |
Petrogas Jatim Utama |
Completed |
3 |
Preservation and Pre-Commissioning, Commissioning and Start Up Medco Simenggaris — Tarakan — North Kalimantan |
JOB Pertamina Medco |
Completed |
4 |
Early Gas HAZOP and Pre Start-up Safety Review for MEDCO Simenggaris – Tarakan — North Kalimantan |
JOB Pertamina Medco |
Completed |
5 |
Front End Engineering Design (FEED) Re-engineering and Optimization LPG Storage, Tanjung Uban, Batam |
Pertamina Marketing Operation Region I |
Completed |
6 |
Detailed Engineering Design (DED) of LNG Benoa Regasification Piping, Control System and Risk Assessment |
PELINDO Ill |
Completed |
7 |
Pre FEED of Sangatta Biodiesel Facility Development Facility Improvement, Design and Calculation, including Cost Estimation |
Petromine Energi (Group Bakrie) |
Completed |
8 |
Pemping – Batam Gas pipeline Commissioning support |
Batam Trans Gasindo |
Completed |
9 |
FEED Pertamina Musi Tmur, LP Compressor Development Project |
PERTAMINA EP Il |
Completed |
10 |
Fit for Services Pipeline Assessment ofTD WIIliamson China |
TD Williamson China |
Completed |
11 |
Quantitative Risk Assessment (QRA) for Ande-Ande Lumut Project Development |
Santos |
Completed |
12 |
Engineering Support for Pigging 24″ APNA – MMC |
Lerindro – PHE ONWJ |
Completed |
13 |
HAZOP Sludge Catcher for KRA Platform – Kakap Field |
Star Energy |
Completed |
14 |
Engineering Support (Process and Process Safety/HAZOP) for Bangka HSD Tank Project |
Rahardja Wirasakti |
Completed |
15 |
HAZOP Pipeline Semare to Pertagas open Access Project |
pertagas |
Completed |
16 |
HAZOP/HAZID for for Jasa Transportasi, Penyimpanan dan Regasifikasi LNG untuk PLTG-PLN Sambera 2 x 20 MW, Kalimantan Timur |
PLN – Pertagas Niaga |
Completed |
17 |
Engineering & Technical Assessment Service for Supporting The 20″ SCP Secondary Repair |
SAKA Indonesia Pangkah Ltd |
Completed |
18 |
Engineering Support for LNG & CNG Filling Station Project – Benoa, Bali |
Pelindo Energi Logistik |
Completed |
19 |
PSSR (Pre Start-up Safety Review) for Jasa Transportasi, Penyimpanan dan Regasifikasi LNG untuk PLTG-PLN Sambera 2 x 20 MW, Kalimantan Timur |
PLN – Pertagas Niaga |
Completed |
20 |
Engineering Support for Stasiun Pengumpul Minyak Mentah di Musi Banyuasin, Sumatera Selatan |
PT. PDPDE |
Completed |